{"id":6576,"date":"2011-07-21T15:02:45","date_gmt":"2011-07-21T19:02:45","guid":{"rendered":"http:\/\/www.bumc.bu.edu\/busm-news\/?p=1645"},"modified":"2011-07-21T15:02:45","modified_gmt":"2011-07-21T19:02:45","slug":"see-new-student-residence-interior-images","status":"publish","type":"post","link":"https:\/\/www.bumc.bu.edu\/camed\/2011\/07\/21\/see-new-student-residence-interior-images\/","title":{"rendered":"See New Student Residence Interior Images"},"content":{"rendered":"<p>Pictures of the interior of the student residence at 815 Albany Street are now available! (see below)<\/p>\n<figure id=\"attachment_1646\" aria-describedby=\"caption-attachment-1646\" style=\"width: 310px\" class=\"wp-caption alignleft\"><a href=\"\/camed\/files\/2011\/07\/125-First-floor-lobby.jpg\"><img loading=\"lazy\" class=\"size-full wp-image-1646\" title=\"125 First floor lobby\" src=\"\/camed\/files\/2011\/07\/125-First-floor-lobby.jpg\" alt=\"First floor lobby.\" width=\"300\" height=\"402\" \/><\/a><figcaption id=\"caption-attachment-1646\" class=\"wp-caption-text\">First floor lobby.<\/figcaption><\/figure>\n<figure id=\"attachment_1647\" aria-describedby=\"caption-attachment-1647\" style=\"width: 310px\" class=\"wp-caption alignright\"><a href=\"\/camed\/files\/2011\/07\/124-This-will-be-an-apartment-suite.jpg\"><img loading=\"lazy\" class=\"size-full wp-image-1647\" title=\"124 This will be an apartment suite\" src=\"\/camed\/files\/2011\/07\/124-This-will-be-an-apartment-suite.jpg\" alt=\"This will be an apartment suite.\" width=\"300\" height=\"402\" \/><\/a><figcaption id=\"caption-attachment-1647\" class=\"wp-caption-text\">This will be an apartment suite.<\/figcaption><\/figure>\n<figure id=\"attachment_1648\" aria-describedby=\"caption-attachment-1648\" style=\"width: 310px\" class=\"wp-caption alignleft\"><a href=\"\/camed\/files\/2011\/07\/126-View-of-the-basement.jpg\"><img loading=\"lazy\" class=\"size-full wp-image-1648\" title=\"126 View of the basement\" src=\"\/camed\/files\/2011\/07\/126-View-of-the-basement.jpg\" alt=\"View of the basement.\" width=\"300\" height=\"402\" \/><\/a><figcaption id=\"caption-attachment-1648\" class=\"wp-caption-text\">View of the basement.<\/figcaption><\/figure>\n<figure id=\"attachment_1649\" aria-describedby=\"caption-attachment-1649\" style=\"width: 310px\" class=\"wp-caption alignright\"><a href=\"\/camed\/files\/2011\/07\/123-The-elevator-shaft.jpg\"><img loading=\"lazy\" class=\"size-full wp-image-1649\" title=\"123 The elevator shaft\" src=\"\/camed\/files\/2011\/07\/123-The-elevator-shaft.jpg\" alt=\"The elevator shaft.\" width=\"300\" height=\"402\" \/><\/a><figcaption id=\"caption-attachment-1649\" class=\"wp-caption-text\">The elevator shaft.<\/figcaption><\/figure>\n<p>Milestones this week include: completion of precast work on the lower floors of the building; second floor stairwell is 70 percent complete, duct work has been roughed-in on the second, third and fourth floors; the sprinkler system has been roughed-in on the second and third floors.<\/p>\n<p>During the week of July 25 there will be considerable progress on the exterior of the building including the start of the construction of the third floor lintel; the installation of the exterior lift for masonry workers,  outside metal fabrication panel work will commence and rough sprinkler work will be begin on the fifth and sixth floors.<\/p>\n<figure id=\"attachment_1653\" aria-describedby=\"caption-attachment-1653\" style=\"width: 310px\" class=\"wp-caption alignleft\"><a href=\"\/camed\/files\/2011\/07\/121-Panoramic-view-of-the-city.jpg\"><img loading=\"lazy\" class=\"size-full wp-image-1653\" title=\"121 Panoramic view of the city\" src=\"\/camed\/files\/2011\/07\/121-Panoramic-view-of-the-city.jpg\" alt=\"Another view from the interior.\" width=\"300\" height=\"402\" \/><\/a><figcaption id=\"caption-attachment-1653\" class=\"wp-caption-text\">View toward the city from the interior.<\/figcaption><\/figure>\n<p><strong>The Structure<\/strong><\/p>\n<p>The nine-story, $40 million structure is designed by Beacon Architectural Associates with a brick and limestone fa\u00e7ade. Its 104 two-bedroom suites that include bath, kitchenette and living spaces will accommodate 208 students, each with individual bedrooms, the standard for graduate student housing. Walsh Brothers is the contractor for the building, which is expected to take 18 months to complete.<\/p>\n<p>Click below to see recent updates on the student residence construction.<\/p>\n<ul>\n<li><a href=\"http:\/\/www.bumc.bu.edu\/busm-news\/2011\/07\/11\/precast-work-on-the-student-residence-has-begun\/\" target=\"_blank\">Mid July news<\/a><\/li>\n<li> <a href=\"http:\/\/www.bumc.bu.edu\/busm-news\/2011\/06\/23\/student-residence-milestone-precast-is-begins-next-week\/\" target=\"_blank\">Late June update<\/a><\/li>\n<li> <a href=\"http:\/\/www.bumc.bu.edu\/busm-news\/2011\/06\/20\/student-residence-construction-milestones-achieved\/\" target=\"_blank\">Construction milestones mid June<\/a><\/li>\n<li><a href=\"http:\/\/www.bumc.bu.edu\/busm-news\/2011\/06\/14\/visible-progress-on-the-student-residence\/\" target=\"_blank\">Visible progress early June<\/a><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Pictures of the interior of the student residence at 815 Albany Street are now available! (see below) Milestones this week include: completion of precast work on the lower floors of the building; second floor stairwell is 70 percent complete, duct work has been roughed-in on the second, third and fourth floors; the sprinkler system has [&hellip;]<\/p>\n","protected":false},"author":903,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/www.bumc.bu.edu\/camed\/wp-json\/wp\/v2\/posts\/6576"}],"collection":[{"href":"https:\/\/www.bumc.bu.edu\/camed\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bumc.bu.edu\/camed\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bumc.bu.edu\/camed\/wp-json\/wp\/v2\/users\/903"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bumc.bu.edu\/camed\/wp-json\/wp\/v2\/comments?post=6576"}],"version-history":[{"count":0,"href":"https:\/\/www.bumc.bu.edu\/camed\/wp-json\/wp\/v2\/posts\/6576\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.bumc.bu.edu\/camed\/wp-json\/wp\/v2\/media?parent=6576"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bumc.bu.edu\/camed\/wp-json\/wp\/v2\/categories?post=6576"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bumc.bu.edu\/camed\/wp-json\/wp\/v2\/tags?post=6576"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}