{"id":6539,"date":"2011-04-21T13:02:45","date_gmt":"2011-04-21T17:02:45","guid":{"rendered":"http:\/\/www.bumc.bu.edu\/busm-news\/?p=1331"},"modified":"2011-04-21T13:02:45","modified_gmt":"2011-04-21T17:02:45","slug":"student-residence-update-first-floor-steel-work-complete-slab-work-to-begin","status":"publish","type":"post","link":"https:\/\/www.bumc.bu.edu\/camed\/2011\/04\/21\/student-residence-update-first-floor-steel-work-complete-slab-work-to-begin\/","title":{"rendered":"Student Residence Update: First Floor Steel Work Complete! Slab Work to Begin!"},"content":{"rendered":"<p>Despite the rainy weather of April, progress at the student residence at 815 Albany Street on the Boston University Medical Campus (BUMC) continues.<\/p>\n<figure id=\"attachment_1333\" aria-describedby=\"caption-attachment-1333\" style=\"width: 310px\" class=\"wp-caption alignleft\"><a href=\"\/camed\/files\/2011\/04\/20-april-2011-second-shot-sized.jpg\"><img loading=\"lazy\" class=\"size-full wp-image-1333\" title=\"20 april 2011 second shot sized\" src=\"\/camed\/files\/2011\/04\/20-april-2011-second-shot-sized.jpg\" alt=\"April 20, 2011\" width=\"300\" height=\"234\" \/><\/a><figcaption id=\"caption-attachment-1333\" class=\"wp-caption-text\">Slightly rainy view of steel.  (April 20, 2011)<\/figcaption><\/figure>\n<p>The first floor steel work that began on April 11 will be completed by April 22.  In addition, both the first and second floor slab work is expected to begin the week of April 25.\u00a0 If weather permits, a floor slab will be poured every four days.<\/p>\n<figure id=\"attachment_1332\" aria-describedby=\"caption-attachment-1332\" style=\"width: 310px\" class=\"wp-caption alignright\"><a href=\"\/camed\/files\/2011\/04\/20-April-2011-first-shot-sized.jpg\"><img loading=\"lazy\" class=\"size-full wp-image-1332\" title=\"20 April 2011 first shot sized\" src=\"\/camed\/files\/2011\/04\/20-April-2011-first-shot-sized.jpg\" alt=\"April 20, 2011\" width=\"300\" height=\"225\" \/><\/a><figcaption id=\"caption-attachment-1332\" class=\"wp-caption-text\">Steel on a clear afternoon.  (April 20, 2011)<\/figcaption><\/figure>\n<p>The nine-story, $40 million structure is designed by Beacon Architectural Associates with a brick and limestone fa\u00e7ade. Its 104 two-bedroom suites that include bath, kitchenette and living spaces will accommodate 208 students, each with individual bedrooms, the standard for graduate student housing. Walsh Brothers is the contractor for the building, which is expected to take 18 months to complete.<\/p>\n<p>Click  below to read other student residence stories<\/p>\n<p>\u2022\t<a href=\"http:\/\/www.bumc.bu.edu\/busm-news\/2011\/04\/06\/foundation-complete-crane-arriving-progress-continues-at-the-student-residence\/\" target=\"_blank\">Early April update<\/a><\/p>\n<p>\u2022\t<a href=\"http:\/\/www.bumc.bu.edu\/busm-news\/2011\/03\/29\/march-construction-at-the-student-residence\/\" target=\"_blank\">Late March story<\/a><\/p>\n<p>\u2022\t<a href=\"http:\/\/www.bumc.bu.edu\/busm-news\/2011\/01\/12\/student-residence-development-underway\/\" target=\"_blank\">Feb\/March progress<\/a><\/p>\n<p>\u2022\t<a href=\"http:\/\/www.bumc.bu.edu\/2011\/01\/12\/student-residence-development-underway\/\" target=\"_blank\">Mid January update<\/a><\/p>\n<p>\u2022\t<a href=\"http:\/\/www.bumc.bu.edu\/busm-news\/2010\/10\/28\/busm-breaks-ground-on-new-student-residence\/\" target=\"_blank\">Ground breaking event<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Despite the rainy weather of April, progress at the student residence at 815 Albany Street on the Boston University Medical Campus (BUMC) continues. The first floor steel work that began on April 11 will be completed by April 22. In addition, both the first and second floor slab work is expected to begin the week [&hellip;]<\/p>\n","protected":false},"author":903,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[91],"tags":[],"_links":{"self":[{"href":"https:\/\/www.bumc.bu.edu\/camed\/wp-json\/wp\/v2\/posts\/6539"}],"collection":[{"href":"https:\/\/www.bumc.bu.edu\/camed\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bumc.bu.edu\/camed\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bumc.bu.edu\/camed\/wp-json\/wp\/v2\/users\/903"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bumc.bu.edu\/camed\/wp-json\/wp\/v2\/comments?post=6539"}],"version-history":[{"count":0,"href":"https:\/\/www.bumc.bu.edu\/camed\/wp-json\/wp\/v2\/posts\/6539\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.bumc.bu.edu\/camed\/wp-json\/wp\/v2\/media?parent=6539"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bumc.bu.edu\/camed\/wp-json\/wp\/v2\/categories?post=6539"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bumc.bu.edu\/camed\/wp-json\/wp\/v2\/tags?post=6539"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}